信管网每日一练

导航

系统集成项目管理工程师每日一练试题(2020/12/23)

2020年12月24日来源:信管网 作者:cnitpm

系统集成项目管理工程师当天每日一练试题地址:www.cnitpm.com/exam/ExamDay.aspx?t1=2

往期系统集成项目管理工程师每日一练试题汇总:www.cnitpm.com/class/27/e2_1.html

系统集成项目管理工程师每日一练试题(2020/12/23)在线测试:www.cnitpm.com/exam/ExamDay.aspx?t1=2&day=2020/12/23

点击查看:更多系统集成项目管理工程师习题与指导

系统集成项目管理工程师每日一练试题内容(2020/12/23)

试题1

系统运行安全的关键是管理,下列关于日常安全管理的做法,不正确的是( )。
A.系统开发人员和系统操作人员应职责分离
B.信息化部门领导安全管理组织,一年进行一次安全检查
C.用户权限设定应遵循“最小特权”原则
D.在数据转储、维护时要有专职安全人员进行监督

试题解析与讨论:www.cnitpm.com/st/1046361.html
试题参考答案:B

试题2

"需要时,授权实体可以访问和使用的特性"指的是信息安全的( )。
A.保密性
B.完整性
C.可用性
D.可靠性

试题解析与讨论:www.cnitpm.com/st/490169.html
试题参考答案:C

试题3: (  )refers to the application of the internet and other information technology in conventional industries .It is an incomplete equation where various internet(mobile internet,cloud computing,big data or internet of things) can be added to other fileds, fostering new industries and business development.
A、 internet plus
B、industry 4.0
C、big data
D、cloud computing
试题解析与讨论:www.cnitpm.com/st/326803195.html
试题参考答案:A

试题4

(  )指的是为确保项目工作的未来绩效符合项目管理计划而进行的有目的的活动。
A、纠正措施
B、预防措施
C、缺陷补救
D、功能完善

试题解析与讨论:www.cnitpm.com/st/3576226696.html
试题参考答案:B

试题5

按照标准GB/T 16260.1《软件过程 产品质量 第1部分质量模型》规定,软件产品的“安全性”属性属于()评价内容
A、外部质量
B、内部质量
C、过程质量
D、使用质量

试题解析与讨论:www.cnitpm.com/st/125059200.html
试题参考答案:D

试题6

Project  (  ) Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.
A.Integration
B.Scope
C.Configuration
D.Requirement

试题解析与讨论:www.cnitpm.com/st/20270.html
试题参考答案:B

试题7

()不是软件质量保证的主要职能
A、检查开发和管理活动是否与已定的过程策略、标准一致
B、检查工作产品是否遵循模板规定的内容和格式
C、检查开发和管理活动是否与已定的流程一致
D、检查关键交付物的质量

试题解析与讨论:www.cnitpm.com/st/231144223.html
试题参考答案:D

试题8: 信息系统是一种以处理信息为目的的专门系统类型,组成部件包括软件、硬件、数据库、网络、存储设备、规程等。其中()是经过机构化/规范化组织后的事实和信息的集合。
A、软件
B、规程
C、网络
D、数据库
试题解析与讨论:www.cnitpm.com/st/3940125888.html
试题参考答案:D

试题9

Estimating schedule activity costs involves developing an(1 )of the costs of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. For example, in most application areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. The cost estimating process considers whether the expected savings can offset the cost of the additional design work. Cost estimates are generally expressed in units of     (2 )to facilitate comparisons both within and across projects. The(3 )describes the business need, justification, requirements, and current boundaries for the project. It provides important information about project requirements that is considered during cost estimating.
(1)A. accuracy        B. approximation       C. specification       D. summary
(2)A. activity         B. work                C. currency           D. time
(3)A. project scope statement
B. statement of work
C. project management plan
D. project policy

试题解析与讨论:www.cnitpm.com/st/6121.html
试题参考答案:B、C、A

试题10

目前的快速以太网(1000BASE-T)使用交换机来组网,这样做的目的不是为了(1)。此时以太网的拓扑结构类似(2)
(1)A.减少冲突              
B.提高网络速度
C.提高网络使用效率      
D.减少IP地址消耗
(2)A.星型       
B.总线型      
C.环型       
D.网状型

试题解析与讨论:www.cnitpm.com/st/1935012582.html
试题参考答案:D、A

温馨提示:因考试政策、内容不断变化与调整,信管网提供的以上信息仅供参考,如有异议,请考生以权威部门公布的内容为准!

分享至:
请使用浏览器的分享功能,把好文章分享给更多的人

信管网 - 信息系统项目管理专业网站

下载APP-在线学习

培训课程

0元畅享

考试题库

免费资料

APP下载