系统集成项目管理工程师每日一练(2013-12-7)内容

1题:

The(  )describes, in detail, the project’s deliverables and the work required to create those deliverables.
A.project scope statement               
B .project requirement
C.project charter                      
D .product specification

参考答案:A
解析与讨论:http://www.cnitpm.com/st/131.html

2题:

为了让客户对项目团队提供的软件产品的功能满意,项目经理让客户在一份文档上签字以便确认,这份文档是( )
A.技术规范     
B.测试规范     
C.用户手册    
D.质量保证计划

参考答案:A
解析与讨论:http://www.cnitpm.com/st/331.html

3题:

The project maintains a current and approved set of requirements over the life of the project by doing  the following: 
     ·  ( )all changes to the requirements 
     · Maintaining  the relationships among  the requirements, the project plans,  and the work products 
     ·  …… 
A. Monitoring       
B. Managing     
C. Gathering         
D. Reducing

参考答案:B
解析与讨论:http://www.cnitpm.com/st/342.html

4题:

下列有关广域网的叙述中,正确的是( )。
A. 广域网必须使用拨号接入
B. 广域网必须使用专用的物理通信线路
C. 广域网必须进行路由选择
D. 广域网都按广播方式进行数据通信

参考答案:C
解析与讨论:http://www.cnitpm.com/st/450.html

5题:

Many of the activities performed during the preliminary investigation are still being conducted in(1 ), but in much greater depth than before. During this phase, the analyst must become  fully aware of the(2 ) and must develop enough knowledge about the(3 ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4 ) for process and data of current system, the deliverable from this phase also includes the(5 ) for the proposed system.
(1)A. analysis phase                  
B.  design phase 
C.  implementation phase          
D. maintenance phase
(2)A. main symptom                  
B.  root problem
C.  final blueprint                 
D.  data specification
(3)A. hardware environment           
B. testing environment
C. software environment            
D. business environment
(4)A. logical models                  
B. physical models
C. design models                  
D. implementation models
(5)A. hardware and software specification   
B. system performance specification
C. formal requirements definition       
D. general problem statement

参考答案:A、B、D、A、C
解析与讨论:http://www.cnitpm.com/st/476.html

6题:

The Unified Modeling Language is a standard graphical language for modeling object-oriented software.(  )can show the behavior of systems in terms of how objects interact with each other.
A.Class diagram
B.Component diagram
C.Sequence diagram
D.Use case diagram

参考答案:C
解析与讨论:http://www.cnitpm.com/st/547.html

7题:

Precedence Diagramming Method(PDM) is a method used in activity sequencing.There are four types of dependencies or precedence relationships in PDM. The initiation of the successor activity depends upon the completion of the predecessor activity is called (  ).
A.Finish-to-Start     
B.Finish-to-Finish   
C.Start-to-Start      
D.Start-to-Finish

参考答案:A
解析与讨论:http://www.cnitpm.com/st/761.html

8题:

项目由15个单独的子项目构成,为了便于管理,公司为这个项目成立了一个项目管理办公室(PMO),且给这个办公室配备了一个项目管理信息系统,这个系统要包括所有与项目有关的信息,并且系统中的数据可以随时更新,要完成这个管理信息系统,需要收集这15个项目所有工作的相关信息,这些信息构成了(  )的全部内容。
A.项目会计表
B.工作分解结构(WBS)词典
C.工作分解结构(WBS)模板
D.挣值管理报告

参考答案:B
解析与讨论:http://www.cnitpm.com/st/3472.html

9题:

某立项负责人编制了一份ERP开发项目的详细可行性研究报告,目录如下:
①概述   ②需求确定   ③现有资源   ④技术方案   ⑤进度计划  
⑥项目组织   ⑦效益分析  ⑧协作方式   ⑨结论
该报告中欠缺的必要内容是( )
A、应用方案
B、质量计划
C、投资估算
D、项目评估原则

参考答案:C
解析与讨论:http://www.cnitpm.com/st/4257.html

10题:

The intention of the()is to schedule, organize and control all activities to achieve the project goal eventually.no matter how difficult it is and what kind of risks are there.
A、project work breakdown
B、project security authentication
C、project management
D、project flowchart

参考答案:C
解析与讨论:http://www.cnitpm.com/st/6800.html