试卷名称:2009年上半年信息系统项目管理师真题(上午)

考试年份:2009年上半年

试题来源:《2009年上半年信息系统项目管理师真题(上午)》在线考试

试题内容

Many of the activities performed during the preliminary investigation are still being conducted in(1 ), but in much greater depth than before. During this phase, the analyst must become  fully aware of the(2 ) and must develop enough knowledge about the(3 ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4 ) for process and data of current system, the deliverable from this phase also includes the(5 ) for the proposed system.
(1)A. analysis phase
B.  design phase
C.  implementation phase
D. maintenance phase
(2)A. main symptom
B.  root problem
C.  final blueprint
D.  data specification
(3)A. hardware environment
B. testing environment
C. software environment
D. business environment
(4)A. logical models
B. physical models
C. design models
D. implementation models
(5)A. hardware and software specification
B. system performance specification
C. formal requirements definition
D. general problem statement

参考答案:A、B、D、A、C(仅供参考) 收藏