试题1: Estimating schedule activity costs involves developing an(1 )of the costs of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. For example, in most application areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. The cost estimating process considers whether the expected savings can offset the cost of the additional design work. Cost estimates are generally expressed in units of (2 )to facilitate comparisons both within and across projects. The(3 )describes the business need, justification, requirements, and current boundaries for the project. It provides important information about project requirements that is considered during cost estimating.
(1)A. accuracy B. approximation C. specification D. summary
(2)A. activity B. work C. currency D. time
(3)A. project scope statement
B. statement of work
C. project management plan
D. project policy
下列各图描述了DIPP值随着项目进行时间的变化,其中正确的是( )。
项目每个阶段结束时的一个重要工作是进行项目绩效评审,评审的主要目标是( )。
A、决定项目是否能够进入下一个阶段
B、根据过去的绩效调整项目进度和成本基准
C、评定员工业绩和能力
D、得到客户对项目绩效认同
为保证项目的质量,要对项目进行质量管理,项目质量管理过程的第一步是( )。
A.制定项目质量计划
B.确立质量标准体系
C.对项目实施质量监控
D.将实际与标准对照
在编写项目可行性研究报告时,风险因素及对策主要是对项目的市场风险、( )、法律风险,经济及社会风险等因素进行评价,制定规避风险的对策,为项目的全过程的管理提供依据。
A、计算风险,财务防线,环境风险
B、技术风险,财务风险,组织风险
C、技术风险,组织风险,环境风险
D、财务风险,组织风险,环境风险
()is not included in the main contents of the operation and maintenance of the information system.
A.Daily operation and maintenance
B.System change
C.Security management
D.Business change