While monitoring a project process, the quality manager notes four consecutive points are on the same side of the mean, none of which is outside the control limitation. What’s the status for this process
A、It is out control
B、 It is under control
C、 It needs mitigation
D、 It needs investigation
温馨提示:因考试政策、内容不断变化与调整,信管网提供的以上信息仅供参考,如有异议,请考生以权威部门公布的内容为准!
相关推荐