  • 试题1

    某一确定性有限自动机(DFA)的状态转换图如下图所示,令d=0|1|2|…|9,则以下字符串中,不能被该DFA接受的是(1),与该DFA等价的正规式是(2)。(其中,ε表示空字符)
    ① 3875   ② 1.2E+5   ③ -123.   ④ .576E10

    (1)A、①、②、③
    B、①、②、④
    C、②、③、④
    D、①、②、③、④
    (2)A、(-d|d)d*E(-d|d)d*|(-d|d)d*.d*(ε|E(-d|d)d*)
    B、-(d|d)dd*(.|ε)d*(ε|E(-d|d)d*)
    C、(-|d)dd*E(-|d)d*|(-d|d)dd*.d*(ε|E(-|E(-|d)d*)
    D、(-d|d)dd*E(-d|d)d*|(-d|d)dd*.d*(ε|E(-dd*|dd*))

    查看答案

    试题参考答案:B、A

    试题解析与讨论:www.cnitpm.com/st/77342663.html

  • 试题2

    能力成熟度集成模型 CMMI 是 CMM 模型的最新版本,它有连续式和阶段式两种表示方式。基于连续式表示的 CMMI 共有 6 个(0~5)能力等级,每个能力等级对应到一个一般目标以及一组一般执行方法和特定方法,其中能力等级  ( )  主要关注过程的组织标准化和部署。
    A、1
    B、2
    C、3
    D、4

    查看答案

    试题参考答案:C

    试题解析与讨论:www.cnitpm.com/st/82872853.html

  • 试题3

    将高级语言源程序翻译成目标程序的是()。
    A.解释程序
    B.编译程序
    C.链接程序
    D.汇编程序

    查看答案

    试题参考答案:B

    试题解析与讨论:www.cnitpm.com/st/2483518354.html

  • 试题4

    关于螺旋模型,下列陈述中不正确的是( )( )。
    (1)A.将风险分析加入到瀑布模型中
    B.将开发过程划分为几个螺旋周期,每个螺旋周期大致和瀑布模型相符
    C.适合于大规模、复杂且具有高风险的项目
    D.可以快速的提供一个初始版本让用户测试
    (2)A.支持用户需求的动态变化
    B.要求开发人员具有风险分析能力
    C.基于该模型进行软件开发,开发成本低
    D.过多的迭代次数可能会增加开发成本,进而延迟提交时间

    查看答案

    试题参考答案:D、C

    试题解析与讨论:www.cnitpm.com/st/4546622529.html

  • 试题5

    现有四级指令流水线,分别完成取指、取数、运算、传送结果四步操作。若完成上述操作的时间依次为9ns、10ns、6ns、8ns。则流水线的操作周期应设计为( )。
    A、6 
    B、8 
    C、9 
    D、10 

    查看答案

    试题参考答案:D

    试题解析与讨论:www.cnitpm.com/st/76502634.html

  • 试题6

    在敏捷过程的开发方法中,()使用了迭代的方法,其中,把每段时间(30 天)一次的迭代称为一个“冲刺”,并按需求的优先级别来实现产品,多个自组织和自治的小组并行地递增实现产品。
    A.极限编程 XP
    B.水晶法
    C.并列争球法
    D.自适应软件开发

    查看答案

    试题参考答案:C

    试题解析与讨论:www.cnitpm.com/st/2862021833.html

  • 试题7

    “X = (A + B ) × ( C - D / E )”的后缀式表示为 ( ) 。
    A、XAB+CDE/-×=
    B、XAB+C-DE /×=
    C、XAB+CDE-/×=
    D、XAB+CD-E/×=

    查看答案

    试题参考答案:A

    试题解析与讨论:www.cnitpm.com/st/78892716.html

  • 试题8

    there is nothing in this world constant but inconstancy.-SWIFT
    Project after project designs a set of algorithms and then plunges intoconstruction of customer-deliverable software on a schedule that demands delivery of the first thing built.
    In most projects, the first system built is (1) usable. It may be too slow, too big , awkward to use, or all three. There is no (2 ) but to start again, smarting but smarter and build a redesigned version in which these problems are solved. The discard and (3) may be done in one lump, or it may be done piece-by-piece. But all large-system experience shows that it will be done. Where a new system concept or new technology is used, one has to build a syste m to throw away, for even the best
    planning is not so omniscient (全知的) as to get it fight the first time.
    the management question, therefore, is not whether to build a pilot system and throw it away. You will do that. The only question is whether to plan in advance to build a (4).or to promise to deliver the throwaway to customers. Seen this way, the answer is much clearer. Delivering that throwaway to customers buys time, but it does so only at the (5) of agony (极大痛苦) for the user, distraction for the builders while they do the redesign, and a bad..reputation for the product that the best redesign will find hard to live down.
    Henceplanto throw one away; you will,anyhow.
    The management question, therefore, is not whether to build a pilot system and throw it away. You will do that. The only question is whether to plan in advance to build a throwaway, or to promise to deliver the throwaway to customers. Seen this way, the answer is much clearer. Delivering that throwaway to customers buys time, but it does so only at the cost of agony for the user, distraction for the builders while they do the redesign, and a bad reputation for the product that the best redesign will find hard to live down.
    (1)A.almost
    B.often
    C.usually
    D.barely
    (2)A.alternative
    B.need
    C.possibility
    D.solution
    (3)A.design
    B.redesign
    C.plan
    D.build
    (4) A.throwaway
    B.system
    C.software
    D.product
    (5) A.worth
    B. value
    C. cost
    D. invaluable

    查看答案

    试题参考答案:D、A、B、A、C

    试题解析与讨论:www.cnitpm.com/st/271552319.html

  • 试题9

    软件项目成本估算模型COCOM01I中,体系结构阶段模型基于(  )进行估算。
    A.应用程序点数量
    B.功能点数量
    C.复用或生成的代码行数
    D.源代码的行数

    查看答案

    试题参考答案:D

    试题解析与讨论:www.cnitpm.com/st/4510218726.html

  • 试题10

    表达式“X = A + B × (C - D)/E”的后缀表示形式可以为 ( ) (运算符优先级相同时,遵循左结合的原则)。
    A、XAB + CDE/-×=
    B、XA+BC-DE/×=
    C、XABCD-×E/+=
    D、XABCDE+×-/=

    查看答案

    试题参考答案:C

    试题解析与讨论:www.cnitpm.com/st/79442735.html