软件设计师每日一练试题内容(2022/3/4)

试题1

对于长度为 m(m>1)的指定序列,通过初始为空的一个栈,一个队列后,错误的叙述是( )
A、若入栈和入队的序列相同,则出栈序列和出队序列可能相同
B、若入栈和入队的序列相同,则出栈序列和出队序列可以互为逆序
C、入队序列与出队序列关系为 1:1,而入栈序列与出栈序列关系是 1:n(n≧1)
D、入栈序列与出队序列关系为 1:1,而入队序列与出栈序列关系是 1:n(n≧1)

试题解析与讨论:www.cnitpm.com/st/82562843.html
试题参考答案:D

试题2

UML中关联是一个结构关系,描述了一组链。两个类之间(40)关联。
A.不能有多个
B.可以有多个由不同角色标识的
C.可以有任意多个
D.的多个关联必须聚合成一个

试题解析与讨论:www.cnitpm.com/st/253392062.html
试题参考答案:B

试题3: Creatingaclearmapofwheretheprojectisgoingisanimportantfirststep.Itletsyouidentifyrisks,clarifyobjectives,anddetermineiftheprojectevenmakessense.Theonlythingmoreimportantthanthereleaseplanisnottotakeittooseriously.
PeleaseplanningiscreatingagameplanforyourWebproject()whatyouthinkyouwantyourWebsitetobe.Theplanisaguideforthecontent,designelements,andfunctionalityofaWebsitetobereleasedtothepublic,topartners,orinternally.Italso()howlongtheprojectwilltakeandhowmuchitwillcost.Whattheplanisnotisafunctional()thatdefinestheprojectindetailorthatproducesabudgetyoucantaketothebank.
BasicallyyouuseareleasePlantodoaninitialsanitycheckoftheproject's()andworthiness.ReleasePlansareusefulroadmaps,butdon'tthinkofthemasguidestotheinterstateroadsystem.Instead,thinkofthemasthe()usedbyearlyexplorers--halfumorandguessandhalfhopeandexpectation.
It'salwaysagoodideatohaveamapofwhereaprojectisheaded
(71)A.constructing
B.designing
C.implementing
D.outlining
(72)A.defines
B.calculates
C.estimates
D.knows
(73)A.specification
B.structure
C.requirement
D.implementation
(74)A.correctness
B.modifiability
C.feasibilit
D.traceability
(75)A.navigators
B.maps
C.guidant
D.goals
试题解析与讨论:www.cnitpm.com/st/396282725.html
试题参考答案:D、C、A、C、B

试题4

以下关于高级程序设计语言实现的编译和解释方式的叙述中,正确的是( )。
A.编译程序不参与用户程序的运行控制,而解释程序则参与
B.编译程序可以用高级语言编写,而解释程序只能用汇编语言编写
C.编译方式处理源程序时不进行优化,而解释方式则进行优化
D.编译方式不生成源程序的目标程序,而解释方式则生成

试题解析与讨论:www.cnitpm.com/st/253242117.html
试题参考答案:A

试题5


(2)A、由其后序遍历序列和中序遍历序列可以构造该二叉树的先序遍历序列
B、由其先序遍历序列和后序遍历序列可以构造该二叉树的中序遍历序列
C、由其层序遍历序列和中序遍历序列可以构造该二叉树的先序遍历序列
D、由其层序遍历序列和中序遍历序列不能构造该二叉树的后序遍历序列

试题解析与讨论:www.cnitpm.com/st/82532842.html
试题参考答案:C、B

试题6: The project workbook is not so much a separate document as it is a structure imposed on the documents that the project will be producing anyway.
All the documents of the project need to be part of this ( ). This includes objectives ,external specifications , interface specifications , technical standards , internal specifications and administrative memoranda(备忘录).
Technical prose is almost immortal. If one examines the genealogy ( Ff ) of a customer manual for a piece of hardware or software , one can trace not only the ideas , but also many of the very sentences and paragraphs back to the first (请作答此空) proposing the product or explaining the first design. For the technical writer, the paste-pot is as mighty as the pen.
Since this is so, and since tomorrow's product-quality manuals will grow from today’s memos, it is very important to get the structure of the documentation right. The early design of the project ( ) ensures that the documentation structure itself is crafted, not haphazard. Moreover, the establishment of a structure molds later writing into segments that fit into that structure.
The second reason for the project workbook is control of the distribution of ( ). The problem is not to restrict information, but to ensure that relevant information gets to all the people who need it.
The first step is to number all memoranda, so that ordered lists of titles are available and h worker can see if he has what he wants. The organization of the workbook goes well beyond this to establish a tree-structure of memoranda. The ( ) allows distribution lists to be maintained by subtree, if that is desirable.
A.objective
B.memoranda
C.standard
D.specification
试题解析与讨论:www.cnitpm.com/st/407629685.html
试题参考答案:B

试题7

在数据库逻辑结构的设计中,将E-R模型转换为关系模型应遵循相关原则。对于三个不同实体集和它们之间的多对多联系m:n:p,最少可转换为( )个关系模式。
A、2 
B、3
C、4 
D、5 

试题解析与讨论:www.cnitpm.com/st/75772609.html
试题参考答案:C

试题8: 极限编程(XP)的十二个最佳实践不包括()。
A.小的发布
B.结对编程
C.持续集成
D.精心设计
试题解析与讨论:www.cnitpm.com/st/3947616119.html
试题参考答案:D

试题9

设某循环队列Q的定义中有front和rear两个域变量其中,front指示队头元素的位置,rear指示队尾元素之后的位置,如下图所示。若该队列的容量为M,则其长度为(  )。

A. (Q.rear-Q.front +1)
B. [Q.rcar-a.front+M)
C. [Q.rear-Cl.front+1)%M
D.(Qrear-Q.front+M)%M

试题解析与讨论:www.cnitpm.com/st/255028725.html
试题参考答案:D

试题10

下图所示平衡二叉树(树中任一结点的左右子树高度之差不超过1)中,结点A的右子树AR高度为h,结点B的左子树BL高度为h,结点C的左子树CL、右子树CR高度都为h-1。若在CR中插入一个结点并使得CR的高度增加1,则该二叉树 ( ) 。

A、以B为根的子二叉树变为不平衡
B、以C为根的子二叉树变为不平衡
C、以A为根的子二叉树变为不平衡
D、仍然是平衡二叉树

试题解析与讨论:www.cnitpm.com/st/80302765.html
试题参考答案:C